A summary of the Appraisal of Sustainability which describes how the proposals for High Speed Two support objectives for sustainable development.
This document was published on 11th March 2010 by Booz & Co / Temple.
It was written by Booz & Co / Temple.
The original document format was PDF File, and comprised 26 pages.The original document can be found here.
This document was kindly sourced from Department for Industry and Commerce, Irish Free State and is in our Strategy documents collection. It was added to the Archive on 12th March 2010.
This document is © Booz & Co / Temple.
"The appraisal of sustainability (AoS) report describes the extent to which the proposed new high speed railway between London and the West Midlands either supports or detracts from the objectives for sustainable development. The report focuses on a scheme that has been identified by HS2 Ltd as being preferred in overall terms, taking account of different factors including strategic fit, build cost, engineering and economic benefits, as well as sustainability. The AoS also addresses a number of alternatives that were considered in determining the HS2 preferred scheme."
14th January 2009
The Role and Funding of High Speed Two (HS2) Limited
13th February 2009
Objectives and remit for HS2
9th March 2009
Objectives and remit for HS2
February 2010
High Speed Two - Baseline Forecasting Report: A Report for HS2
February 2010
HS2 Airport Demand Model (ADM):A Report for HS2
25th February 2010
Advice on the Assessment of Wider Economic Impacts: a report for HS2
11th March 2010
Appraisal of Sustainability: A Report for HS2 - Non Technical Summary
11th March 2010
Britains Transport Infrastructure - High Speed Two
11th March 2010
High Speed Rail
11th March 2010
High Speed Rail - London to the West Midlands and Beyond - HS2 Cost and Risk Model
11th March 2010
High Speed Rail - London to the West Midlands and Beyond - HS2 Demand Model Analysis
11th March 2010
High Speed Rail - London to the West Midlands and Beyond - HS2 List of Reference Documents
11th March 2010
High Speed Rail - London to the West Midlands and Beyond - HS2 Technical Appendix
11th March 2010
High Speed Rail - Summary
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 1...
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 2...
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 3...
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 3a...
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 3b...
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 3c...
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 3d...
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 3e...
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 4...
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 5...
11th March 2010
High Speed Rail London to the West Midlands and Beyond: A Report to Government by High Speed Two Limited - Chapter 6...
11th March 2010
Route Engineering Study Final Report: A Report for HS2 (Appendices)
11th March 2010
Route Engineering Study Final Report: A Report for HS2 (Chapter 10)
11th March 2010
Route Engineering Study Final Report: A Report for HS2 (Chapter 11)
11th March 2010
Route Engineering Study Final Report: A Report for HS2 (Chapter 5)
11th March 2010
Route Engineering Study Final Report: A Report for HS2 (Chapter 6)
11th March 2010
Route Engineering Study Final Report: A Report for HS2 (Chapter 7)
11th March 2010
Route Engineering Study Final Report: A Report for HS2 (Chapter 8)
11th March 2010
Route Engineering Study Final Report: A Report for HS2 (Chapter 9)
11th March 2010
Route Engineering Study Final Report: A Report for HS2 (Chapters 1 to 4)
11th March 2010
The High Speed Rail Revolution: History and Prospects
Does the franchise model just need technical changes or would a concession system be better?
or just view the results
Join our 1663 other members and sign up to receive the RA newsletter, with links to all new documents and other site news...
See how our privacy policy protects your address.
Please consider donating to help with our running costs.