The report on the stranding of a passenger train between Dock Junction and Kentish Town in 2010.
This document was published in May 2012 by Rail Accident Investigation Branch.
It was written by Rail Accident Investigation Branch.
This item is linked to the Accident at Dock Junction - Kentish Town on 26th May 2011
The original document format was PDF File, and comprised 65 pages.The original document can be found here.
This document was kindly sourced from Rail Accident Investigation Branch and is in our Accident reports collection. It was added to the Archive on 24th May 2012 by the Archivist.
This document is Crown Copyright, and is subject to the terms governing the reproduction of crown copyright material. Depending on the status and age of the original document, you may need an OPSI click-use license if you wish to reproduce this material, and other restrictions may apply. Please see this explanation for further details.
"At around 18:26 hrs on Thursday 26 May 2011, a First Capital Connect service from Brighton to Bedford lost traction power and became stranded between St. Pancras and Kentish Town stations. Almost three hours elapsed before the train, with its passengers still on board, was assisted into Kentish Town station.
During the period that the train was stranded, conditions for passengers became increasingly uncomfortable because the train was heavily loaded and the air-conditioning and toilets stopped working at an early stage. Some passengers
opened doors to improve ventilation and passenger alarms were repeatedly activated.
The strategy for rescuing the stranded train was to bring another train onto the front and haul it into Kentish Town station. The arrival of the assisting train was delayed and it did not couple onto the front of the failed train until around 20:20 hrs. During the next 50 minutes, the driver of the combined train tried to complete the arrangements necessary for its movement into Kentish Town. He was hampered by further operation of alarms by passengers frustrated at the continuing delay, and his uncertainty over the status of the doors (open or closed) on part of the train. A small number of passengers started to alight from the train.
Eventually, the driver over-rode a safety system in order to move the train. At the time when the train moved a short distance for the driver to test that it was properly coupled, some passengers were still alighting from the train to the track. When the train subsequently moved into Kentish Town, it did so with at least two doors open.
The investigation found that options for evacuating passengers, other than the use of an assisting train, had either been discounted or had not been briefed to those staff responsible for developing the rescue strategy on the day. There had been very little communication with passengers during the incident because the public address system on the train failed about 45 minutes after the train became stranded. Previous incidents of a similar nature had been investigated by First Capital Connect, but actions had not been taken on the findings.
The RAIB has made:
- one recommendation to First Capital Connect in relation to its management processes for emergency preparedness;
- one recommendation to Network Rail and the train operators on developing a set of principles for dealing with stranded trains; and
- one recommendation to Network Rail and the train operators to review their processes for undertaking incident reviews so that safety lessons are captured, tracked to closure and shared with other industry stakeholders."
Does the franchise model just need technical changes or would a concession system be better?
or just view the results
Join our 1664 other members and sign up to receive the RA newsletter, with links to all new documents and other site news...
See how our privacy policy protects your address.
Please consider donating to help with our running costs.